Charles Sturt University – 4.4MW Multi Site Solar Rollout

Charles Sturt University 4.4MW Multi Site Commercial Solar Installation

Share This Post

Client: Charles Sturt University

System Size: 4.4MW

Approximate First Years Output: 2,700 MWh

After finishing a 6,000-panel system at the Wagga Wagga campus in 2016, CSU contracted Todae Solar to design and install 4.4MW multi-site rollout across 17 buildings. Now, this multi-site installation is one of Australia’s largest rooftop solar power systems. It is expected to produce 2,700,000kW in its first year; thereby reducing the University’s green gas emissions by 2,513 tonnes what is a good step forward by keep an eye on reducing their carbon footprint. The project was finished in late 2017 and a third solar power system of 2.6MW were installed in 2018.

For more information please have a look in our commercial solar news

More To Explore

Enquire Now

Fill out the form below and we will get back to you as soon as we can.

Enter Your Details
Enter Your Details